Cernos Method
- Frozen sand is taken from stock pile and lumps are crushed.
- Crushed and screened sand is fed to the concrete production process.
Customer: Hokkasen Betoni, Finland
Material: Frozen sand
Density: 1,8 tn/m³
Capacity: 40 m³/h
Screenshots from application
Benefits for Cernos Method
- Sand can be kept in outside storage over the winter.
- Only nbeeded amount of sand needs to be crushed/screened and brought to process.
- Only nbeeded amount of sand needs to be crushed/screened and brought to process
- High capacity
- No need for storaging sand in warm and dry place
- Reduces production costs
- Speeds up production rate